C15 Concrete Zanzibar

Low-strength concrete for non-structural applications. Ideal for blinding, bedding, and light trench fill work.

Laboratory Tested
Washed Sand
Premium Aggregates
Engineer Approved
Zanzibar Wide Delivery

Low-strength concrete for non-structural applications. Ideal for blinding, bedding, and light trench fill work. C15 concrete is manufactured at Zanzibaba's laboratory-tested batching plant using washed sand and premium aggregates, ensuring consistent quality for non-structural applications across Zanzibar.

Current ZanziCore rate available on request

Indicative pricing — confirm on WhatsApp for current rates.

Grade Specifications

Compressive Strength

15 MPa

Cement Content

~200 kg/m³

Aggregate Size

20mm

Slump Range

60–120mm

Curing Period

28 days

Recommended Projects

Residential pathways
Garden borders
Kerb foundations
Temporary works
Blinding for footings

FREQUENTLY ASKED QUESTIONS

C15 Concrete Questions Answered

What is C15 concrete used for?

C15 concrete is used for non-structural applications like blinding, trench fill, kerbing, and bedding layers where high strength is not required.

Can C15 concrete be used for foundations?

C15 is only suitable for light trench fill and blinding. For structural foundations, C20 or higher is recommended.

Foundations

Foundations — Project Gallery

Concrete foundation construction — strip footings, raft foundations, pad footings and trench fill for Zanzibar projects.

Ready mix concrete being poured into foundation formwork at a Zanzibar construction site

Concrete Foundation Pour Zanzibar

Laboratory-tested C25 concrete poured into foundation footings for a residential villa in Paje, Zanzibar.

concrete foundations zanzibar

Concrete strip footing pour for a coastal villa foundation in Zanzibar

Strip Footing Concrete Pour Zanzibar

C30 concrete strip footing being poured for a beachfront villa foundation in Nungwi, Zanzibar.

strip footing concrete zanzibar

Steel reinforcement cages ready for concrete foundation pour in Zanzibar

Foundation Reinforcement Steel Zanzibar

Rebar reinforcement cages positioned and tied for a raft foundation before concrete placement.

foundation reinforcement zanzibar

Construction site coordinator reviewing foundation plan and concrete BOQ in Zanzibar

Foundation Planning Zanzibar

Site team reviewing foundation specifications and concrete volume calculations before ordering.

concrete foundation planning zanzibar

Applications & Uses

Blinding layers
Trench fill
Kerbing
Pathways
Light bedding

Need C15 Concrete in Zanzibar?

Get a fast quote — share your grade, volume and project location on WhatsApp.